Monday, January 10, 2011
Other particular application business from now on)
According to the plan, telecommunication breadth in Shanghai takes an average bandwidth to attain a 8 Ms(the net represented by 1 M soon extreme limit each 128 Kbs) and attains a 32 Ms in 2013 in 2011 and attain in 201550 Ms;Each trillion bandwidth price of year the average reduction will also attain 40%~50%.
According to the introduction, any Shanghai telecommunication has already had breadth to take a customer, only place small area through city only net engineering reformation completion fiber optic overlay, can carry out a fiber optic into the door, and free carry out breadth to take velocity to double on the existing bandwidth foundation.
Is concrete to come to speak, original breadth is taking is the customer with 512 Ks, realization fiber optic connect into behind can ast least be free to lift soon arrive 2 Ms, tallest free lift soon arrive 3 M bandwidth, the in addition 10 M applied bandwidth(plait note:Applied the bandwidth mainly used for IPTV to wait currently Gao bandwidth business, also will gradually open to video frequency, and game...etc. other particular application business from now on);The original breadth takes the velocity as the customer with 2 Ms, can connect to go into through a fiber optic free rise to soon arrive a 4 Ms to get to the Internet a bandwidth at least, tallest free rise soon arrive the 10 Ms get to the Internet bandwidth, the in addition 10 M applied bandwidth.
Subscribe to:
Post Comments (Atom)
No comments:
Post a Comment